If your roof needs repairs, restoration or replacement and you already have solar panels, involve a solar electrician before the roof work is booked. The first question is whether the proposed work affects the panels, their mounting system or electrical equipment. That needs an assessment, not a guess from the ground.
This checklist helps homeowners on the Sunshine Coast and in surrounding areas organise the conversation between the roofer, solar electrician and anyone else managing the job. It is a planning guide, not instructions for removing panels or working on electrical equipment.
1. Give both trades the same description of the roof work
A small repair, a full re-roof and a renovation that changes the roof shape are different projects. Give the roofer and solar electrician the same written scope so they can identify where their work overlaps.
Useful information to gather includes:
- The property location and the roofer’s proposed work and dates.
- Whether the roof material, shape or layout will change.
- Your solar installation paperwork, if available.
- The panel and inverter details recorded in your documents or monitoring app.
- Any existing fault messages, leaks or concerns you have already noticed.
Use existing records and photographs taken safely from the ground. Do not climb onto the roof or open equipment to find a label. Missing paperwork is something to explain to the electrician, not a reason to investigate the system yourself.
2. Agree who is responsible for the solar work
Do not assume the roofing quote includes disconnecting and reinstating the solar system. Ask who will assess it, who will perform the electrical work and who will return it to service.
In Queensland, electrical maintenance and installation work must be carried out by a licensed electrician. The Queensland Electrical Safety Office recommends an electrician who regularly works on solar for this type of system. You can read its solar safety and maintenance guidance.
Switching off your home’s mains supply does not make solar equipment safe to handle. The Australian Government warns that a solar system can remain energised when the mains are off. Leave disconnection, electrical checks and reconnection to the professionals. See the Solar Consumer Guide’s repair advice.
3. Ask whether the existing equipment can be reused
A roof project does not, on its own, answer whether you need new solar panels. Ask for an assessment of the existing system before agreeing to either reuse or replacement.
Have the solar electrician explain:
- Which existing components are suitable to retain.
- Whether the proposed roof or layout changes affect the solar design or mounting arrangements.
- What repairs or replacement components are included, and what remains subject to inspection.
- Whether the planned work requires any updated documentation or network approvals.
- How the proposed work affects the relevant product and workmanship warranties.
Ask for the reasons in writing. Avoid assuming that everything must be replaced because it is older, or that every existing component can automatically go back onto the new roof.
4. Compare the full scope, not just the removal price
A useful quote should make it clear what happens before, during and after the roof work. Use these questions to identify gaps between the roofing and solar quotes:
- Does the price cover both removal and reinstallation, where required?
- Who provides the access arrangements needed for each stage?
- Who is responsible for storing and protecting any removed equipment?
- Who handles temporary weather protection and the roofing work around mounting points?
- How are unexpected defects or changes priced and approved?
- Are the final electrical testing, system handover and monitoring checks included?
Keep the answers with your quotes. A clear division of responsibilities is more useful than relying on each contractor to assume the other has included something.
5. Plan the return visit before the panels come off
Agree how the roofer will confirm that the site is ready for the solar work to resume. Identify who will coordinate the return visit and how you will be told about changes.
Ask what happens if weather delays the roof work, if inspection identifies an unexpected problem, or if replacement equipment is needed. Have the solar electrician explain which parts of your system will be unavailable during the work. If you have a battery, ask separately how the project affects it; do not assume its normal operation or backup function will continue.
6. Keep a clear record when the work is finished
Before closing out the job, ask the solar electrician to explain the system’s status, any changes made and any operating instructions you need to follow. If monitoring is fitted, ask them to demonstrate that you can access it and explain what you should expect to see.
Keep the job records, relevant electrical documentation, updated equipment details and warranty information together. The Australian Government’s installation handover guide is a useful reference for the kinds of solar documents a homeowner should retain.
A quick checklist before you book
- Both trades have the same roof-work scope.
- A licensed solar electrician has assessed the solar side.
- The quotes identify the work included and any unresolved items.
- Storage, weather protection and responsibility for each stage are agreed.
- The return visit, testing and handover are planned.